NASA Langley Research Center

Project: NASA Langley Research Center
Location: Hampton, Virginia

Design/Construction Team

Architect:
AECOM
Arlington, VA
https://www.aecom.com/

Installer:
Henry J. Knott Masonry, Inc.
Timonium, MD
http://www.hjkmasonry.com/

General Contractor:
W.M. Jordan Company, Inc.
Wilmington, NC
https://www.wmjordan.com/

NeaCera® Panel Summary

Height: 304.8mm (12”)

Length: 1219.2mm (48”)

Finish: Matte

Color: Brick Red 2066

Shape: Smooth

Configuration: Stacked

Weight: 7.5 lbs/SF

Clips: Never on a NeaCera® Project!

Photographs

Project Summary

The NASA Langley Research Center in Hampton, Virginia is adding a brand new Measurement Systems Laboratory to their campus. This world-class facility is a part of a 20-year revitalization plan, reflecting a $95.6 million contract awarded to General Contractor, W.M Jordan Co. This 175,000-square-foot building will be home to 40 modular labs and 244 staff members, and is slated to be completed in 2019.