Wills Wharf – Harbor Point

Project: Wills Wharf – Harbor Point
Location: Baltimore, MD

Design/Construction Team

Architect:
Beatty Harvey Coco Architects, LLP
Baltimore, MD
https://www.bhc-architects.com/

Installer:
Henry J. Knott Masonry, Inc.
Timonium, MD
http://www.hjkmasonry.com/

General Contractor:
Armada Hoffler Construction Co.
Baltimore, MD
http://armadahofflerconstruction.com/

NeaCera® Panel Summary

Height: 304.8mm (12”)

Length: 1524mm (60”)

Color: Dark Gray

Finish: Matte

Shape: Flat Classic

Configuration: Stacked

Weight: 7.5 lbs/SF

Clips: Never on a NeaCera® Project!

Special Conditions: Flush Joint Insert

Photographs

Project Summary

The Wills Wharf building at Harbor Point on Baltimore’s Inner Harbor will be the fourth building constructed on this 27-acre development site. This 330,000-square-foot, mixed-use building is a $17-Million investment by developer Beatty Development Group. At 12-stories, this building will include office, retail, and hotel space. Breaking ground in 2018, this project is slated for completion in 2020.